ITAC Assessment: HO0186
ITAC logo
ITAC Assessment: HO0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Windows
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area 185,785
ft2
Annual Production 196,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,928 1,472,450
kWh
Electricity Demand $69,373 11,909
kW-mo/yr
Electricity Fees $(-15,565.0) -
Natural Gas $86,511 13,819
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,191

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $268 - $268
2,931
kWh
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,988 - - $3,988
-
kW-mo/yr
- -
03 2.7231: Use radiant heater for spot heating $6,903 $6,000 - - $6,903
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $8,873 $3,000 - - $8,873
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $11,162 $5,000 - - $11,162
-
MMBtu
-
06 4.514: Re-arrange equipment layout to reduce handling costs $3,900 $1,000 - - - $3,900
TOTAL RECOMMENDED $35,094 $15,000 $268
2,931
kWh
$3,988
-
kW-mo/yr
$26,938
-
MMBtu
$3,900
TOTAL IMPLEMENTED $28,191 $9,000 $268
2,931
kWh
$3,988
-
kW-mo/yr
$20,035
-
MMBtu
$3,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs