ITAC Assessment: LT8448
ITAC logo
ITAC Assessment: LT8448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Wholesale grocery distribution
NAICS 424490: Other Grocery and Related Products Merchant Wholesalers
SIC 5141: Groceries, General Line
Sales Range greater than $500
M
# of Employees 400
Plant Area 75,000
ft2
Annual Production 22,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,182,591 18,117,550
kWh
Electricity Demand $588,818 34,616
kW-mo/yr
Electricity Fees $208,265 -
TOTAL YEARLY COSTS $1,979,674
RECOMMENDED SAVINGS* $644,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $59,468 $219,165 $59,468
910,696
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,180 - $1,180
18,058
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,744 $7,812 $2,068
31,667
kWh
$1,677
-
kW-mo/yr
04 2.7447: Install vinyl strip / high speed / air curtain doors $23,347 $8,904 $10,432
159,758
kWh
$12,915
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $556,491 $7,323,896 $497,039
7,611,629
kWh
$59,452
-
kW-mo/yr
TOTAL RECOMMENDED $644,231 $7,559,777 $570,188
8,731,808
kWh
$74,043
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs