ITAC Assessment: SU0529
ITAC logo
ITAC Assessment: SU0529
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Industrial Laundry Equipment
NAICS 333310: Commercial and Service Industry Machinery Manufacturing
SIC 3582: Commercial Laundry, Drycleaning, and Pressing Machines
Sales Range $10
M
to 50
M
# of Employees 214
Plant Area 255,000
ft2
Annual Production 500
units
Production Hrs. Annual 3,900
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,929 1,816,991
kWh
Electricity Demand $76,768 6,526
kW-mo/yr
Electricity Fees $12,478 -
Natural Gas $23,138 7,609
MMBtu
LPG $11,752 134
MMBtu
TOTAL YEARLY COSTS $212,065
RECOMMENDED SAVINGS* $43,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $670 - $345
7,188
kWh
$325
-
kW-mo/yr
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,834 - - $3,834
-
kW-mo/yr
- - -
03 2.4322: Use or replace with energy efficient substitutes $1,775 $250 $1,224
25,500
kWh
$882
-
kW-mo/yr
$(-330.7)
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,688 $6,050 $3,688
76,837
kWh
- - - -
05 2.9114: Use solar heat to make electricty $23,544 $39,388 $9,432
196,500
kWh
$14,112
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $158 $274 $158
3,295
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,318 $2,488 $393
8,190
kWh
$356
-
kW-mo/yr
- - $569
08 2.1321: Replace fossil fuel equipment with electrical equipment $8,392 $24,000 $(-3,360.0)
(-70,000)
kWh
- - $11,752
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $99 $494 $99
2,052
kWh
- - - -
TOTAL RECOMMENDED $43,478 $72,944 $11,979
249,562
kWh
$19,509
-
kW-mo/yr
$(-330.7)
-
MMBtu
$11,752
-
MMBtu
$569
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs