ITAC Assessment: LS2606
ITAC logo
ITAC Assessment: LS2606
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Oilfield Flanges
NAICS 332911: Industrial Valve Manufacturing
SIC 3462: Iron and Steel Forgings
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 80,000
ft2
Annual Production 17,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,759 1,128,465
kWh
Electricity Demand $24,865 4,973
kW-mo/yr
TOTAL YEARLY COSTS $147,624
RECOMMENDED SAVINGS* $147,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8117: Install sub-metering equipment $6,150 $2,500 $6,150
56,423
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,072 $13,213 $8,312
76,258
kWh
$1,760
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $386 $570 $386
3,544
kWh
- - -
04 3.2176: Increase use of automation $95,199 $150,000 $(-5,577.0)
(-51,168)
kWh
- $100,776 -
05 2.4322: Use or replace with energy efficient substitutes $35,573 $285,000 $7,533
69,114
kWh
- $8,840 $19,200
TOTAL RECOMMENDED $147,380 $451,283 $16,804
154,171
kWh
$1,760
-
kW-mo/yr
$109,616 $19,200
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs