ITAC Assessment: GT0531
ITAC logo
ITAC Assessment: GT0531
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Apparel
NAICS
n/a
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 31,000
ft2
Annual Production 880,000
pieces
Production Hrs. Annual 3,025
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,857 508,499
kWh
Natural Gas $9,631 2,451
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,490 $200 $3,490
34,291
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,600 $25,440 $11,600
113,716
kWh
-
03 2.7135: Install occupancy sensors $880 $130 $880
8,499
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $80 $250 $80
879
kWh
-
05 2.2135: Repair and eliminate steam leaks $640 $450 - $640
-
MMBtu
06 2.2113: Repair or replace steam traps $4,900 $2,500 - $4,900
-
MMBtu
TOTAL RECOMMENDED $21,590 $28,970 $16,050
157,385
kWh
$5,540
-
MMBtu
TOTAL IMPLEMENTED $20,710 $28,840 $15,170
148,886
kWh
$5,540
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs