Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,614

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8446 #04 Y:2026 Install occupancy sensors $186 $568
LT8446 #03 Y:2026 Turn off equipment when not in use $304 $871
LT8446 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $139 $308
LT8446 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $494 $1,223
LS0526 #06 Y:2026 Clean or color roof to reduce solar load $20,698 $48,296
LS0526 #05 Y:2026 Replace existing chiller with high efficiency model $31,399 $70,000
LS0526 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $5,871 $2,880
LS0526 #03 Y:2026 Install occupancy sensors $3,643 $1,500
LS0526 #02 Y:2026 Chill water to the highest temperature possible $27,684 $500
LS0526 #01 Y:2026 Reduce space conditioning during non-working hours $40,408 -
AM0979 #05 Y:2026 Use solar heat to make electricty $10,884 $307,663
AM0979 #04 Y:2026 Reduce fluid flow rates $3,276 $1,000
AM0979 #03 Y:2026 Reschedule plant operations or reduce load to avoid peaks $1,201 $1,000
AM0979 #02 Y:2026 Install occupancy sensors $325 $2,780
AM0979 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $6,426 $31,689
UW2604 #06 Y:2026 Replace existing equipment with more suitable substitutes $111,859 $272,750
UW2604 #05 Y:2026 Preheat boiler makeup water with waste process heat $142,638 $20,887
UW2604 #04 Y:2026 Increase efficiency of trucks $13,220 $159,000
UW2604 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $20,196 $17,161
UW2604 #02 Y:2026 Use most efficient type of electric motors $1,937 $13,038