ITAC Assessment: LS0526
ITAC logo
ITAC Assessment: LS0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product High School
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 85
Plant Area 180,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,015
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,765 652,581
kWh
Electricity Demand $5,466 4,202
kW-mo/yr
TOTAL YEARLY COSTS $101,231
RECOMMENDED SAVINGS* $121,424 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7224: Reduce space conditioning during non-working hours $40,408 $175 $40,408
274,890
kWh
-
02 2.2625: Chill water to the highest temperature possible $27,684 $500 $27,684
188,329
kWh
-
03 2.7135: Install occupancy sensors $3,643 $1,500 $3,643
24,781
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,871 $2,880 $5,308
36,109
kWh
$563
-
kW-mo/yr
05 2.2622: Replace existing chiller with high efficiency model $31,399 $70,000 $31,399
213,600
kWh
-
06 2.7425: Clean or color roof to reduce solar load $12,419 $48,296 $12,419
84,483
kWh
-
TOTAL RECOMMENDED $121,424 $123,351 $120,861
822,192
kWh
$563
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs