ITAC Assessment: AM0979
ITAC logo
ITAC Assessment: AM0979
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Primary school graduates
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 62
Plant Area 59,984
ft2
Annual Production 127
units
Production Hrs. Annual 2,764
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,661 1,028,160
kWh
Electricity Demand $42,351 3,582
kW-mo/yr
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $103,013
RECOMMENDED SAVINGS* $22,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,426 $31,689 $3,363
57,002
kWh
$3,063
-
kW-mo/yr
02 2.7135: Install occupancy sensors $325 $2,780 $325
5,509
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,201 $1,000 $886
15,010
kWh
$315
-
kW-mo/yr
04 2.5123: Reduce fluid flow rates $3,276 $1,000 $3,276
55,529
kWh
-
05 2.9114: Use solar heat to make electricty $10,884 $307,663 $10,884
184,478
kWh
-
TOTAL RECOMMENDED $22,112 $344,132 $18,734
317,528
kWh
$3,378
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs