Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Audio/Video cables
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $50
M
to 100
M
# of Employees 620
Plant Area 220,000
ft2
Annual Production 30,000
units
Production Hrs. Annual 4,550
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,153 2,431,200
kWh
Natural Gas $28,488 4,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,619 $2,800 $2,307
28,665
kWh
$312
-
kW-mo/yr
-
02 2.7132: Install timers on light switches in little used areas $2,726 $7,750 $2,402
29,846
kWh
$324
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,122 $13,280 $3,615
44,919
kWh
$507
-
kW-mo/yr
-
04 3.5311: Recover and reuse waste material $24,800 - - - $24,800
-
lb
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $16,728 $70,000 - - $16,728
-
lb
TOTAL RECOMMENDED $50,995 $93,830 $8,324
103,430
kWh
$1,143
-
kW-mo/yr
$41,528
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs