| Assessment Year | 2026 |
|---|---|
| Principal Product | Emission control systems |
| NAICS | 333111: Farm Machinery and Equipment Manufacturing |
| SIC | 3523: Farm Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
115,500
ft2
|
| Annual Production | 100
ton
|
| Production Hrs. Annual | 2,607
hrs
|
| Location (State) | Louisiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $40,916 | 448,080 |
kWh
|
$0.091 | |
| Electricity Demand | $1,904 | 747 |
kW-mo/yr
|
$2.55 | |
| LPG | $11,469 | 741 |
MMBtu
|
$15.48 | |
| Fuel Oil #1 | $8,777 | 1,217 |
MMBtu
|
$7.21 | |
| Waste Disposal Costs | |||||
| Water Usage | $263 | 78 |
Tgal
|
$3.36 | |
| Water Disposal | $488 | 85 |
Tgal
|
$5.72 | |
| Other Liquid (non-haz) | $259 | 1 |
gal
|
$259.20 | |
| TOTAL YEARLY COSTS | $64,077 | ||||
| RECOMMENDED SAVINGS* | $2,282 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $494 | $1,223 |
$436
4,776
kWh
|
$58
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $139 | $308 |
$139
1,528
kWh
|
- | - | |
| 03 | 2.6218: Turn off equipment when not in use | $304 | $871 |
$269
2,947
kWh
|
$35
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $186 | $568 |
$168
1,842
kWh
|
$22
-
kW-mo/yr
|
$(-4.3) | |
| 05 | 4.132: Purchase new equipment to reduce material use / cost | $1,159 | $33,752 | - | - | $1,159 | |
| TOTAL RECOMMENDED | $2,282 | $36,722 |
$1,013
11,092
kWh
|
$115
-
kW-mo/yr
|
$1,155 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs