ITAC Assessment: LT8446
ITAC logo
ITAC Assessment: LT8446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Emission control systems
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 115,500
ft2
Annual Production 100
ton
Production Hrs. Annual 2,607
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,916 448,080
kWh
Electricity Demand $1,904 747
kW-mo/yr
LPG $11,469 741
MMBtu
Fuel Oil #1 $8,777 1,217
MMBtu
Waste Disposal Costs
Water Usage $263 78
Tgal
Water Disposal $488 85
Tgal
Other Liquid (non-haz) $259 1
gal
TOTAL YEARLY COSTS $64,077
RECOMMENDED SAVINGS* $2,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $494 $1,223 $436
4,776
kWh
$58
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $139 $308 $139
1,528
kWh
- -
03 2.6218: Turn off equipment when not in use $304 $871 $269
2,947
kWh
$35
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $186 $568 $168
1,842
kWh
$22
-
kW-mo/yr
$(-4.3)
05 4.132: Purchase new equipment to reduce material use / cost $1,159 $33,752 - - $1,159
TOTAL RECOMMENDED $2,282 $36,722 $1,013
11,092
kWh
$115
-
kW-mo/yr
$1,155
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs