Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,755

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0690 #09 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $10,897 $11,400
SD0690 #08 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $357 $1,271
SD0690 #07 Y:2026 Reduce the pressure of compressed air to the minimum required $1,060 -
SD0690 #06 Y:2026 Use / purchase optimum sized compressor $826 $1,230
SD0690 #05 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $335 $600
SD0690 #04 Y:2026 Use battery storage for demand control $150,344 $206,780
SD0690 #03 Y:2026 Use solar heat to make electricty $90,071 $134,797
SD0690 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,062 $5,475
SD0690 #01 Y:2026 Use cascade system of recirculating during cold weather to avoid sub-cooling $16,696 $2,250
MI0473 #06 Y:2026 Clean or color roof to reduce solar load $5,599 $23,200
MI0473 #05 Y:2026 Install vinyl strip / high speed / air curtain doors $625 $1,200
MI0473 #04 Y:2026 Turn off equipment when not in use $2,046 $2,600
MI0473 #03 Y:2026 Use separate switches on perimeter lighting which may be turned off when natural light is available $253 $80
MI0473 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $7,098 $1,980
MI0473 #01 Y:2026 Use power during off-peak periods $3,799 -
LT8446 #04 Y:2026 Install occupancy sensors $186 $568
LT8446 #03 Y:2026 Turn off equipment when not in use $304 $871
LT8446 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $139 $308
LT8446 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $494 $1,223
LS0526 #06 Y:2026 Clean or color roof to reduce solar load $20,698 $48,296