ITAC Assessment: MI0473
ITAC logo
ITAC Assessment: MI0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Medical Injection Molding
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 23,000
ft2
Annual Production 6,000,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,556 1,118,040
kWh
Electricity Demand $38,017 2,802
kW-mo/yr
Electricity Fees $19,592 -
TOTAL YEARLY COSTS $126,165
RECOMMENDED SAVINGS* $19,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3137: Use power during off-peak periods $3,799 - - $3,799
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,098 $1,980 $4,323
70,876
kWh
$2,775
-
kW-mo/yr
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $253 $80 $154
2,530
kWh
$99
-
kW-mo/yr
04 2.6218: Turn off equipment when not in use $2,046 $2,600 $2,046
33,541
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $625 $1,200 $381
6,244
kWh
$244
-
kW-mo/yr
06 2.7425: Clean or color roof to reduce solar load $5,599 $23,200 $3,410
55,902
kWh
$2,189
-
kW-mo/yr
TOTAL RECOMMENDED $19,420 $29,060 $10,314
169,093
kWh
$9,106
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs