Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,614

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0698 #07 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $1,728 $3,200
SD0698 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $100 $847
SD0698 #05 Y:2026 Recharge batteries on during off-peak demand periods $2,048 -
SD0698 #04 Y:2026 Reschedule plant operations or reduce load to avoid peaks $1,200 -
SD0698 #03 Y:2026 Repair and eliminate steam leaks $2,690 $600
SD0698 #02 Y:2026 Use waste heat from hot flue gases to preheat $1,975 $1,671
SD0698 #01 Y:2026 Increase amount of condensate returned $19,217 $12,000
WM0264 #06 Y:2026 Install occupancy sensors $1,610 $404
WM0264 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,214 $4,160
WM0264 #04 Y:2026 Install compressor air intakes in coolest locations $3,232 $830
WM0264 #03 Y:2026 Reduce space conditioning during non-working hours $8,670 $3,600
WM0264 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $21,881 -
WM0264 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $27,876 $17,100
UC2612 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $958 $121
UC2612 #04 Y:2026 Insulate bare equipment $13,344 $24,580
UC2612 #03 Y:2026 Insulate bare equipment $2,159 $1,280
UC2612 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $506 $405
UC2612 #01 Y:2026 Apply for tax-free status for energy purchases $3,526 -
UA0312 #09 Y:2026 Recover waste heat from equipment $5,403 $8,397
UA0312 #08 Y:2026 Improve air circulation with destratification fans / other methods $16,043 $55,305