ITAC Assessment: UC2612
ITAC logo
ITAC Assessment: UC2612
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Hot Mix Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 11
Plant Area 422,703
ft2
Annual Production 125,060
units
Production Hrs. Annual 3,120
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,329 231,307
kWh
Electricity Demand $36,281 1,807
kW-mo/yr
Electricity Fees $7,589 -
Natural Gas $296,398 36,990
MMBtu
Fuel Oil #2 $36,267 1,477
MMBtu
TOTAL YEARLY COSTS $403,863
RECOMMENDED SAVINGS* $20,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $3,526 - - - $3,526 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $506 $405 $333
2,817
kWh
$173
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $2,159 $1,280 - - - $2,159
-
MMBtu
04 2.2511: Insulate bare equipment $13,344 $24,580 - - - $13,344
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $958 $121 $579
4,902
kWh
$379
-
kW-mo/yr
- -
TOTAL RECOMMENDED $20,493 $26,386 $912
7,719
kWh
$552
-
kW-mo/yr
$3,526 $15,503
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs