Assessment Year | 2019 |
---|---|
Principal Product | Wooden Pellets |
NAICS | 321999: All Other Miscellaneous Wood Product Manufacturing |
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
280,000
ft2
|
Annual Production | 228,654
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,346,879 | 40,834,056 |
kWh
|
$0.057 |
Electricity Demand | $432,933 | 83,339 |
kW-mo/yr
|
$5.19 |
Electricity Fees | $(-19,629.0) | - |
|
- |
Natural Gas | $365,352 | 38,335 |
MMBtu
|
$9.53 |
TOTAL YEARLY COSTS | $3,125,535 | |||
RECOMMENDED SAVINGS* | $2,459,774 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $400,304 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,405 | $24,659 |
$11,589
201,659
kWh
|
- | $(-184.0) | - | - | |
02 | 2.7135: Install occupancy sensors | $639 | $1,455 |
$649
11,289
kWh
|
- | $(-10.0) | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,492 | $1,345 |
$2,532
44,061
kWh
|
- | $(-40.0) | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,928 | $100 |
$2,975
51,770
kWh
|
- | $(-47.0) | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,287 | $791 |
$4,356
75,787
kWh
|
- | $(-69.0) | - | - | |
06 | 2.4131: Size electric motors for peak operating efficiency | $9,787 | $16,620 |
$9,945
173,042
kWh
|
- | $(-158.0) | - | - | |
07 | 2.4323: Use optimum size and capacity equipment | $374,108 | $1,310,277 |
$380,152
6,614,793
kWh
|
- | $(-6,044.0) | - | - | |
08 | 2.8114: Change rate schedules or other changes in utility service | $26,196 | $150 | - |
$26,619
-
kW-mo/yr
|
$(-423.0) | - | - | |
09 | 4.652: Replace existing equipment with more suitable substitutes | $2,027,932 | $1,000,000 |
$(-76,414.0)
(-1,329,634)
kWh
|
- | - |
$(-11,926.0)
-
MMBtu
|
$2,116,272 | |
TOTAL RECOMMENDED | $2,459,774 | $2,355,397 |
$335,784
5,842,767
kWh
|
$26,619
-
kW-mo/yr
|
$(-6,975.0) |
$(-11,926.0)
-
MMBtu
|
$2,116,272 | ||
TOTAL IMPLEMENTED | $400,304 | $1,310,427 |
$380,152
6,614,793
kWh
|
$26,619
-
kW-mo/yr
|
$(-6,467.0) | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs