ITAC Assessment: PV0005
ITAC logo
ITAC Assessment: PV0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product FAB. STEEL & ALLOY PRDTS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,927 160,903
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,271 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $437 $17 $437
4,982
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,834 - $3,834
56,272
kWh
TOTAL RECOMMENDED $4,271 $17 $4,271
61,254
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs