ITAC Assessment: NT0018
ITAC logo
ITAC Assessment: NT0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Coating, Engraving and Allied Services
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 81
Plant Area 771,012
ft2
Annual Production 66,769,477
lb
Production Hrs. Annual 5,184
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,984 1,586,593
kWh
Electricity Demand $47,204 3,669
kW-mo/yr
Electricity Fees $2,301 -
Natural Gas $287,848 71,448
MMBtu
Waste Disposal Costs
Water Usage $26,551 1,385
Tgal
TOTAL YEARLY COSTS $472,888
RECOMMENDED SAVINGS* $135,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,361 $4,553 $1,647
23,967
kWh
$714
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $35,653 $1,258 - - $35,653
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,450 $1,311 - - $1,450
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,420 $11,457 $28,187
410,290
kWh
$7,233
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,528 - $2,461
35,824
kWh
$1,067
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $8,460 $6,082 - $8,460
-
kW-mo/yr
- -
07 4.231: Purchase equipment instead of leasing $45,600 $27,500 - - - $45,600
08 2.7221: Lower temperature during the winter season and vice-versa $1,056 - $1,056
15,372
kWh
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,092 $5,443 $1,080
15,725
kWh
$1,012
-
kW-mo/yr
- -
TOTAL RECOMMENDED $135,620 $57,604 $34,431
501,178
kWh
$18,486
-
kW-mo/yr
$37,103
-
MMBtu
$45,600
TOTAL IMPLEMENTED $35,420 $11,457 $28,187
410,290
kWh
$7,233
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs