Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,079

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2521 #07 Y:2025 Use solar heat to make electricty $37,653 $526,500
LS2521 #06 Y:2025 Replace existing equipment with more suitable substitutes $70,474 $710,000
LS2521 #05 Y:2025 Clean or color roof to reduce solar load $3,125 $12,153
LS2521 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,368 $2,575
LS2521 #03 Y:2025 Clean and maintain refrigerant condensers and towers $746 $392
LS2521 #02 Y:2025 Utilize daylight whenever possible in lieu of artificial light $796 $300
LS2521 #01 Y:2025 Install timers and/or thermostats $1,212 $25
LE0604 #10 Y:2025 Replace existing hvac unit with high efficiency model $13,939 $42,829
LE0604 #09 Y:2025 Utilize energy-efficient belts and other improved mechanisms $157,500 $340,000
LE0604 #08 Y:2025 Install compressor air intakes in coolest locations $1,699 $3,000
LE0604 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,702 $4,527
LE0604 #06 Y:2025 Replace fossil fuel equipment with electrical equipment $50,845 $60,000
LE0604 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,648 $1,825
LE0604 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,274 $1,640
LE0604 #03 Y:2025 Install timers and/or thermostats $7,578 $1,600
LE0604 #02 Y:2025 Install occupancy sensors $2,212 $350
LE0604 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $2,762 -
SJ0043 #08 Y:2025 Use demand controller or load shedder $5,591 -
SJ0043 #07 Y:2025 Maintain air filters by cleaning or replacement $14,251 $1,430
SJ0043 #06 Y:2025 Use optimum temperature $43,185 -