| Assessment Year | 2026 |
|---|---|
| Principal Product | Steel Products |
| NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 96 |
| Plant Area |
125,000
ft2
|
| Annual Production | 13,223
ton
|
| Production Hrs. Annual | 4,368
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $56,505 | 1,593,600 |
kWh
|
$0.035 |
| Electricity Demand | $130,489 | 5,507 |
kW-mo/yr
|
$23.70 |
| Electricity Fees | $12,188 | - |
|
- |
| Natural Gas | $45,356 | 4,982 |
MMBtu
|
$9.10 |
| TOTAL YEARLY COSTS | $244,538 | |||
| RECOMMENDED SAVINGS* | $55,045 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $5,606 | $8,923 | - | - | $5,606 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,308 | $945 |
$2,308
65,019
kWh
|
- | - | |
| 03 | 2.9114: Use solar heat to make electricty | $35,670 | $476,148 |
$16,150
454,936
kWh
|
$19,520
-
kW-mo/yr
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $1,551 | - |
$630
17,761
kWh
|
$921
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $901 | $1,397 |
$901
25,409
kWh
|
- | - | |
| 06 | 2.6242: Minimize operation of equipment maintained in standby condition | $2,209 | - |
$2,209
63,645
kWh
|
- | - | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $6,800 | - | - |
$6,800
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $55,045 | $487,413 |
$22,198
626,770
kWh
|
$27,241
-
kW-mo/yr
|
$5,606 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs