ITAC Assessment: UL2601
ITAC logo
ITAC Assessment: UL2601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Steel Products
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 125,000
ft2
Annual Production 13,223
ton
Production Hrs. Annual 4,368
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,505 1,593,600
kWh
Electricity Demand $130,489 5,507
kW-mo/yr
Electricity Fees $12,188 -
Natural Gas $45,356 4,982
MMBtu
TOTAL YEARLY COSTS $244,538
RECOMMENDED SAVINGS* $55,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $5,606 $8,923 - - $5,606
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,308 $945 $2,308
65,019
kWh
- -
03 2.9114: Use solar heat to make electricty $35,670 $476,148 $16,150
454,936
kWh
$19,520
-
kW-mo/yr
-
04 2.7111: Reduce illumination to minimum necessary levels $1,551 - $630
17,761
kWh
$921
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $901 $1,397 $901
25,409
kWh
- -
06 2.6242: Minimize operation of equipment maintained in standby condition $2,209 - $2,209
63,645
kWh
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,800 - - $6,800
-
kW-mo/yr
-
TOTAL RECOMMENDED $55,045 $487,413 $22,198
626,770
kWh
$27,241
-
kW-mo/yr
$5,606
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs