ITAC Assessment: OR0824
ITAC logo
ITAC Assessment: OR0824
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Orthopedic implants
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 27,000
ft2
Annual Production 126,000
units
Production Hrs. Annual 4,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,072 1,656,803
kWh
Electricity Demand $93,976 4,994
kW-mo/yr
Electricity Fees $10 -
Natural Gas $69,492 6,002
MMBtu
TOTAL YEARLY COSTS $276,550
RECOMMENDED SAVINGS* $13,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,084 $500 $7,084
103,793
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,992 $3,020 $2,756
40,378
kWh
$1,236
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,882 $2,736 $1,418
20,783
kWh
$1,464
-
kW-mo/yr
TOTAL RECOMMENDED $13,958 $6,256 $11,258
164,954
kWh
$2,700
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs