ITAC Assessment: SD0291
ITAC logo
ITAC Assessment: SD0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product milling and blending of herbal powders
NAICS
n/a
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 90,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 3,875
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,282 1,851,795
kWh
Electricity Demand $55,391 6,436
kW-mo/yr
Electricity Fees $2,874 -
Natural Gas $61,408 9,450
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $398,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,611 $48,000 n/a $23,790
255,807
kWh
$6,821
-
kW-mo/yr
- -
02 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $324,586 $870,000 n/a $252,262
2,712,500
kWh
$72,324
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $14,793 $5,000 $8,499
91,388
kWh
$6,294
-
kW-mo/yr
- -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $22,460 $1,500 - - $22,460
-
lb
-
05 3.6192: Use a less expensive method of waste removal $1,452 - - - - $1,452
06 3.5216: Recycle nonferrous dust $2,530 - - - $2,530
-
lb
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,452 $6,000 - - $1,452
-
lb
-
08 2.8123: Pay utility bills on time $626 - - - - $626
TOTAL RECOMMENDED $398,510 $930,500 $284,551
3,059,695
kWh
$85,439
-
kW-mo/yr
$26,442
-
lb
$2,078
TOTAL IMPLEMENTED $26,442 $1,500 - - $24,990
-
lb
$1,452
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs