Assessment Year | 1986 |
---|---|
Principal Product | POULTRY PROCESSING |
NAICS |
n/a
|
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
n/a
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $254,138 | 4,668,816 |
kWh
|
$0.054 |
Natural Gas | $167,348 | 28,792 |
MMBtu
|
$5.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,827 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $64,827 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $9,580 | $17,200 | - |
$9,580
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $43,200 | $41,600 | - |
$43,200
-
MMBtu
|
|
03 | 2.6124: Establish equipment maintenance schedule | $2,480 | $500 | - |
$2,480
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,140 | $500 | - |
$4,140
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $1,090 | $1,120 | - |
$1,090
-
MMBtu
|
|
06 | 2.2514: Cover open tanks | $1,560 | $3,000 | - |
$1,560
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $670 | $730 |
$670
12,309
kWh
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $1,157 | $5,063 |
$1,157
21,102
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $950 | $1,650 |
$950
17,585
kWh
|
- | |
TOTAL RECOMMENDED | $64,827 | $71,363 |
$2,777
50,996
kWh
|
$62,050
-
MMBtu
|
||
TOTAL IMPLEMENTED | $64,827 | $71,363 |
$2,777
50,996
kWh
|
$62,050
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs