| Assessment Year | 2026 |
|---|---|
| Principal Product | Silver Powder/Powder Refining |
| NAICS | 331492: Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) |
| SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
| Sales Range | $10 M to 50M |
| # of Employees | 149 |
| Plant Area |
131,660
ft2
|
| Annual Production | 900
ton
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,410,035 | 10,773,650 |
kWh
|
$0.13 |
| Electricity Demand | $160,259 | 19,136 |
kW-mo/yr
|
$8.37 |
| Electricity Fees | $48,676 | - |
|
- |
| Natural Gas | $636,578 | 79,534 |
MMBtu
|
$8.00 |
| TOTAL YEARLY COSTS | $2,255,548 | |||
| RECOMMENDED SAVINGS* | $254,039 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $44,729 | $4,400 |
$41,455
316,450
kWh
|
$3,274
-
kW-mo/yr
|
- | |
| 02 | 2.7135: Install occupancy sensors | $1,327 | $200 |
$1,327
10,127
kWh
|
- | - | |
| 03 | 2.2113: Repair or replace steam traps | $24,632 | $10,000 | - | - |
$24,632
-
MMBtu
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,801 | $10,000 |
$11,772
89,856
kWh
|
$1,029
-
kW-mo/yr
|
- | |
| 05 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $3,210 | $3,880 |
$977
7,464
kWh
|
$25
-
kW-mo/yr
|
$2,208
-
MMBtu
|
|
| 06 | 2.2622: Replace existing chiller with high efficiency model | $116,186 | $277,439 |
$106,812
815,360
kWh
|
$9,374
-
kW-mo/yr
|
- | |
| 07 | 2.7232: Replace existing hvac unit with high efficiency model | $51,154 | $342,500 |
$36,460
278,328
kWh
|
$3,198
-
kW-mo/yr
|
$11,496
-
MMBtu
|
|
| TOTAL RECOMMENDED | $254,039 | $648,419 |
$198,803
1,517,585
kWh
|
$16,900
-
kW-mo/yr
|
$38,336
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs