Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,808

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2606 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $77 $98
UC2606 #01 Y:2026 Pay utility bills on time $7,137 -
TR0077 #03 Y:2026 Install vinyl strip / high speed / air curtain doors $14,999 $16,975
TR0077 #02 Y:2026 Install replacement doors $956 $2,842
TR0077 #01 Y:2026 Use solar heat to make electricty $103,228 $307,000
SJ0048 #07 Y:2026 Reduce space conditioning during non-working hours $5,619 -
SJ0048 #06 Y:2026 Re-use or recycle hot or cold process exhaust air $1,791 $1,127
SJ0048 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $6,383 $15,726
SJ0048 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,357 -
SJ0048 #03 Y:2026 Utilize controls to operate equipment only when needed $5,082 $13
SJ0048 #02 Y:2026 Insulate bare equipment $2,012 $2,696
SJ0048 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $1,488 $7,009
ORC026 #05 Y:2026 Reduce ventilation air $6,021 $35,000
ORC026 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $725 $2,500
ORC026 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,008 $5,000
ORC026 #02 Y:2026 Install set-back timers $589 $20
ORC026 #01 Y:2026 Utilize controls to operate equipment only when needed $546 -
OK1169 #04 Y:2026 Use solar heat to make electricty $17,602 $218,400
OK1169 #03 Y:2026 Install occupancy sensors $1,749 $16,874
OK1169 #02 Y:2026 Replace old machine with new automatic multi-station tool $29,325 $395,500