ITAC Assessment: SJ0048
ITAC logo
ITAC Assessment: SJ0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Food species
NAICS 311942: Spice and Extract Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 45,916
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,931 468,390
kWh
Electricity Demand $20,094 1,653
kW-mo/yr
Natural Gas $35,387 1,601
MMBtu
TOTAL YEARLY COSTS $123,412
RECOMMENDED SAVINGS* $22,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,488 $7,009 $1,075
7,410
kWh
$413
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $2,105 $1,983 - - $2,105
-
MMBtu
03 2.6231: Utilize controls to operate equipment only when needed $5,082 $13 $238
1,638
kWh
- $4,844
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,357 - $4,029
27,782
kWh
$328
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,383 $15,726 $4,924
33,949
kWh
$1,459
-
kW-mo/yr
-
06 2.2443: Re-use or recycle hot or cold process exhaust air $1,791 $1,127 - - $1,791
-
MMBtu
07 2.7224: Reduce space conditioning during non-working hours $1,595 - $295
2,032
kWh
- $1,300
-
MMBtu
TOTAL RECOMMENDED $22,801 $25,858 $10,561
72,811
kWh
$2,200
-
kW-mo/yr
$10,040
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs