| Assessment Year | 2026 |
|---|---|
| Principal Product | education |
| NAICS | 611110: Elementary and Secondary Schools |
| SIC | 8221: Colleges, Universities, and Professional Schools |
| Sales Range | less than $500 k |
| # of Employees | 1 |
| Plant Area |
134,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 1,000
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $92,500 | 1,049,464 |
kWh
|
$0.088 |
| Electricity Demand | $47,356 | 3,532 |
kW-mo/yr
|
$13.41 |
| Natural Gas | $41,392 | 4,971 |
MMBtu
|
$8.33 |
| TOTAL YEARLY COSTS | $181,248 | |||
| RECOMMENDED SAVINGS* | $10,754 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6231: Utilize controls to operate equipment only when needed | $546 | - |
$546
6,196
kWh
|
- | - | |
| 02 | 2.6232: Install set-back timers | $589 | $20 |
$589
6,680
kWh
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,008 | $5,000 |
$3,008
34,128
kWh
|
- | - | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $725 | $2,500 |
$600
6,803
kWh
|
$125
-
kW-mo/yr
|
- | |
| 05 | 2.7314: Reduce ventilation air | $5,887 | $35,000 | - | - |
$5,887
-
MMBtu
|
|
| TOTAL RECOMMENDED | $10,754 | $42,520 |
$4,743
53,807
kWh
|
$125
-
kW-mo/yr
|
$5,887
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs