ITAC Assessment: ORC026
ITAC logo
ITAC Assessment: ORC026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product education
NAICS 611110: Elementary and Secondary Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 1
Plant Area 134,000
ft2
Annual Production 1
units
Production Hrs. Annual 1,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,500 1,049,464
kWh
Electricity Demand $47,356 3,532
kW-mo/yr
Natural Gas $41,392 4,971
MMBtu
TOTAL YEARLY COSTS $181,248
RECOMMENDED SAVINGS* $10,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $546 - $546
6,196
kWh
- -
02 2.6232: Install set-back timers $589 $20 $589
6,680
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,008 $5,000 $3,008
34,128
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $725 $2,500 $600
6,803
kWh
$125
-
kW-mo/yr
-
05 2.7314: Reduce ventilation air $5,887 $35,000 - - $5,887
-
MMBtu
TOTAL RECOMMENDED $10,754 $42,520 $4,743
53,807
kWh
$125
-
kW-mo/yr
$5,887
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs