ITAC Assessment: OK0475
ITAC logo
ITAC Assessment: OK0475
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Centrifugal and reciprocating pumps
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 96,000
ft2
Annual Production 3,600
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,362 4,752,052
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.7241: Install outside air damper / economizer on hvac unit $10,960 $1,800 $10,960
258,206
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $600 $3,553 $600
14,361
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $513 $50 $563
13,482
kWh
- $(-50.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,280 $1,819 $1,280
70,633
kWh
- -
05 3.1191: Change procedures / equipment / operating conditions $14,929 $30,000 $66
1,465
kWh
$14,889
-
gal
$(-26.0)
TOTAL RECOMMENDED $28,282 $37,222 $13,469
358,147
kWh
$14,889
-
gal
$(-76.0)
TOTAL IMPLEMENTED $2,393 $5,422 $2,443
98,476
kWh
- $(-50.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs