| Assessment Year | 1995 |
|---|---|
| Principal Product | Centrifugal and reciprocating pumps |
| NAICS |
n/a
|
| SIC | 3448: Prefabricated Metal Buildings and Components |
| Sales Range | $10 M to 50M |
| # of Employees | 225 |
| Plant Area |
96,000
ft2
|
| Annual Production | 3,600
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $228,362 | 4,752,052 |
kWh
|
$0.048 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,282 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,393 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7241: Install outside air damper / economizer on hvac unit | $10,960 | $1,800 |
$10,960
258,206
kWh
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $600 | $3,553 |
$600
14,361
kWh
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $513 | $50 |
$563
13,482
kWh
|
- | $(-50.0) | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,280 | $1,819 |
$1,280
70,633
kWh
|
- | - | |
| 05 | 3.1191: Change procedures / equipment / operating conditions | $14,929 | $30,000 |
$66
1,465
kWh
|
$14,889
-
gal
|
$(-26.0) | |
| TOTAL RECOMMENDED | $28,282 | $37,222 |
$13,469
358,147
kWh
|
$14,889
-
gal
|
$(-76.0) | ||
| TOTAL IMPLEMENTED | $2,393 | $5,422 |
$2,443
98,476
kWh
|
- | $(-50.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs