170,687
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0690 #04 Y:2026 | 04 | 2026 | Use battery storage for demand control | $150,344 | $206,780 |
n/a
|
| SD0690 #03 Y:2026 | 03 | 2026 | Use solar heat to make electricty | $90,071 | $134,797 |
n/a
|
| SD0690 #02 Y:2026 | 02 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $4,062 | $5,475 |
n/a
|
| SD0690 #01 Y:2026 | 01 | 2026 | Use cascade system of recirculating during cold weather to avoid sub-cooling | $16,696 | $2,250 |
n/a
|
| MI0473 #06 Y:2026 | 06 | 2026 | Clean or color roof to reduce solar load | $5,599 | $23,200 |
n/a
|
| MI0473 #05 Y:2026 | 05 | 2026 | Install vinyl strip / high speed / air curtain doors | $625 | $1,200 |
n/a
|
| MI0473 #04 Y:2026 | 04 | 2026 | Turn off equipment when not in use | $2,046 | $2,600 |
n/a
|
| MI0473 #03 Y:2026 | 03 | 2026 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $253 | $80 |
n/a
|
| MI0473 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,098 | $1,980 |
n/a
|
| MI0473 #01 Y:2026 | 01 | 2026 | Use power during off-peak periods | $3,799 | - |
n/a
|
| LT8446 #04 Y:2026 | 04 | 2026 | Install occupancy sensors | $186 | $568 |
n/a
|
| LT8446 #03 Y:2026 | 03 | 2026 | Turn off equipment when not in use | $304 | $871 |
n/a
|
| LT8446 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $139 | $308 |
n/a
|
| LT8446 #01 Y:2026 | 01 | 2026 | Utilize higher efficiency lamps and/or ballasts | $494 | $1,223 |
n/a
|
| LS0526 #06 Y:2026 | 06 | 2026 | Clean or color roof to reduce solar load | $20,698 | $48,296 |
n/a
|
| LS0526 #05 Y:2026 | 05 | 2026 | Replace existing chiller with high efficiency model | $31,399 | $70,000 |
n/a
|
| LS0526 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $5,871 | $2,880 |
n/a
|
| LS0526 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $3,643 | $1,500 |
n/a
|
| LS0526 #02 Y:2026 | 02 | 2026 | Chill water to the highest temperature possible | $27,684 | $500 |
n/a
|
| LS0526 #01 Y:2026 | 01 | 2026 | Reduce space conditioning during non-working hours | $40,408 | - |
n/a
|