Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,687

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0680 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $25 $85
SD0680 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $938 $1,623
SD0680 #03 Y:2025 Use most efficient type of electric motors $68,636 $26,246
SD0680 #02 Y:2025 Use battery storage for demand control $314,069 $13,401
SD0680 #01 Y:2025 Use solar heat to make electricty $24,191 $55,932
UD1123 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,634 $6,580
UD1123 #03 Y:2025 Install occupancy sensors $757 $247
UD1123 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $5,778 -
UD1123 #01 Y:2025 Use properly designed and sized hvac equipment $7,271 -
NT0051 #06 Y:2025 Lower temperature during the winter season and vice-versa $586 -
NT0051 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,986 $5,609
NT0051 #04 Y:2025 Optimize plant power factor $2,603 $6,709
NT0051 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $12,814 -
NT0051 #02 Y:2025 Replace existing hvac unit with high efficiency model $32,918 $193,830
NT0051 #01 Y:2025 Reduce scrap production $98,944 $80,000
MS0453 #06 Y:2025 Change procedures / equipment / operating conditions $2,184,220 $60,000
MS0453 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,095 $1,190
MS0453 #04 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $7,830 $5,644
MS0453 #03 Y:2025 Automate finishing process $174,531 $413,494
MS0453 #02 Y:2025 Install back-up equipment $16,920 $3,906