170,687
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0680 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $25 | $85 | |
| SD0680 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $938 | $1,623 | |
| SD0680 #03 Y:2025 | 03 | 2025 | Use most efficient type of electric motors | $68,636 | $26,246 | |
| SD0680 #02 Y:2025 | 02 | 2025 | Use battery storage for demand control | $314,069 | $13,401 | |
| SD0680 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $24,191 | $55,932 | |
| UD1123 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $7,634 | $6,580 | |
| UD1123 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $757 | $247 | |
| UD1123 #02 Y:2025 | 02 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $5,778 | - | |
| UD1123 #01 Y:2025 | 01 | 2025 | Use properly designed and sized hvac equipment | $7,271 | - | |
| NT0051 #06 Y:2025 | 06 | 2025 | Lower temperature during the winter season and vice-versa | $586 | - | |
| NT0051 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,986 | $5,609 | |
| NT0051 #04 Y:2025 | 04 | 2025 | Optimize plant power factor | $2,603 | $6,709 | |
| NT0051 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $12,814 | - | |
| NT0051 #02 Y:2025 | 02 | 2025 | Replace existing hvac unit with high efficiency model | $32,918 | $193,830 | |
| NT0051 #01 Y:2025 | 01 | 2025 | Reduce scrap production | $98,944 | $80,000 | |
| MS0453 #06 Y:2025 | 06 | 2025 | Change procedures / equipment / operating conditions | $2,184,220 | $60,000 |
n/a
|
| MS0453 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,095 | $1,190 |
n/a
|
| MS0453 #04 Y:2025 | 04 | 2025 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $7,830 | $5,644 |
n/a
|
| MS0453 #03 Y:2025 | 03 | 2025 | Automate finishing process | $174,531 | $413,494 |
n/a
|
| MS0453 #02 Y:2025 | 02 | 2025 | Install back-up equipment | $16,920 | $3,906 |
n/a
|