ITAC Assessment: MS0453
ITAC logo
ITAC Assessment: MS0453
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel Beams
NAICS 331221: Rolled Steel Shape Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $50
M
to 100
M
# of Employees 142
Plant Area 80,000
ft2
Annual Production 294,000
units
Production Hrs. Annual 2,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $565,585 3,637,264
kWh
Electricity Demand $299,464 20,471
kW-mo/yr
Natural Gas $344,108 144,425
MMBtu
Waste Disposal Costs
Water Usage $16,574 5,553
Tgal
Water Disposal $443 5,553
Tgal
TOTAL YEARLY COSTS $1,226,174
RECOMMENDED SAVINGS* $2,609,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 4.231: Purchase equipment instead of leasing $138,378 $120,000 - - $6,378
-
MMBtu
$132,000 -
02 4.651: Install back-up equipment $16,920 $3,906 - - - - $16,920
03 4.446: Automate finishing process $260,753 $413,494 $(-9,246.7)
(-59,656)
kWh
- - $270,000 -
04 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $7,830 $5,644 $7,830
50,518
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,095 $1,190 $1,058
6,825
kWh
$37
-
kW-mo/yr
- - -
06 3.1191: Change procedures / equipment / operating conditions $2,184,220 $60,000 - - - - $2,184,220
TOTAL RECOMMENDED $2,609,196 $604,234 $(-358.7)
(-2,313)
kWh
$37
-
kW-mo/yr
$6,378
-
MMBtu
$402,000 $2,201,140
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs