ITAC Assessment: SD0680
ITAC logo
ITAC Assessment: SD0680
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Cement
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3241: Cement, Hydraulic
Sales Range $10
M
to 50
M
# of Employees 15
Plant Area 8,000
ft2
Annual Production 4,000,000
ton
Production Hrs. Annual 3,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,992 769,316
kWh
Electricity Demand $289,200 4,489
kW-mo/yr
TOTAL YEARLY COSTS $444,192
RECOMMENDED SAVINGS* $383,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $24,191 $55,932 $10,276
51,000
kWh
$13,915
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $314,069 $13,401 $(-20,664.8)
(-102,555)
kWh
$334,734
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $27,556 $26,246 $27,556
136,784
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $938 $1,623 $938
4,655
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25 $85 $11
53
kWh
$15
-
kW-mo/yr
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,594 $7,158 $6,097
30,258
kWh
$7,497
-
kW-mo/yr
07 2.1121: Use insulation in furnaces to facilitate heating / cooling $3,261 $2,066 $2,266
11,245
kWh
$995
-
kW-mo/yr
TOTAL RECOMMENDED $383,635 $106,511 $26,479
131,440
kWh
$357,156
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs