Assessment Year | 2025 |
---|---|
Principal Product | Cement |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3241: Cement, Hydraulic |
Sales Range | $10 M to 50M |
# of Employees | 15 |
Plant Area |
8,000
ft2
|
Annual Production | 4,000,000
ton
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $154,992 | 769,316 |
kWh
|
$0.20 |
Electricity Demand | $289,200 | 4,489 |
kW-mo/yr
|
$64.42 |
TOTAL YEARLY COSTS | $444,192 | |||
RECOMMENDED SAVINGS* | $383,635 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $24,191 | $55,932 |
$10,276
51,000
kWh
|
$13,915
-
kW-mo/yr
|
|
02 | 2.3141: Use battery storage for demand control | $314,069 | $13,401 |
$(-20,664.8)
(-102,555)
kWh
|
$334,734
-
kW-mo/yr
|
|
03 | 2.4133: Use most efficient type of electric motors | $27,556 | $26,246 |
$27,556
136,784
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $938 | $1,623 |
$938
4,655
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $25 | $85 |
$11
53
kWh
|
$15
-
kW-mo/yr
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,594 | $7,158 |
$6,097
30,258
kWh
|
$7,497
-
kW-mo/yr
|
|
07 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $3,261 | $2,066 |
$2,266
11,245
kWh
|
$995
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $383,635 | $106,511 |
$26,479
131,440
kWh
|
$357,156
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs