Assessment Year | 2025 |
---|---|
Principal Product | Warehousing, Packaging, Transportation, Spray Drying |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
370,000
ft2
|
Annual Production | 19,797,112
units
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $92,755 | 857,760 |
kWh
|
$0.11 | |
Electricity Demand | $14,839 | 2,094 |
kW-mo/yr
|
$7.09 | |
Electricity Fees | $113 | - |
|
- | |
Natural Gas | $22,279 | 2,598 |
MMBtu
|
$8.58 | |
Waste Disposal Costs | |||||
Water Usage | $842 | 20 |
Tgal
|
$42.10 | |
Water Disposal | $888 | 20 |
Tgal
|
$44.40 | |
Other Liquid (non-haz) | $531 | 1 |
gal
|
$531.00 | |
TOTAL YEARLY COSTS | $132,247 | ||||
RECOMMENDED SAVINGS* | $21,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7233: Use properly designed and sized hvac equipment | $7,271 | - |
$6,469
59,849
kWh
|
$802
-
kW-mo/yr
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,778 | - | - |
$5,778
-
kW-mo/yr
|
|
03 | 2.7135: Install occupancy sensors | $757 | $247 |
$429
3,971
kWh
|
$328
-
kW-mo/yr
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,634 | $6,580 |
$6,265
57,957
kWh
|
$1,369
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $21,440 | $6,827 |
$13,163
121,777
kWh
|
$8,277
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs