ITAC Assessment: UD1123
ITAC logo
ITAC Assessment: UD1123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Warehousing, Packaging, Transportation, Spray Drying
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 370,000
ft2
Annual Production 19,797,112
units
Production Hrs. Annual 6,864
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,755 857,760
kWh
Electricity Demand $14,839 2,094
kW-mo/yr
Electricity Fees $113 -
Natural Gas $22,279 2,598
MMBtu
Waste Disposal Costs
Water Usage $842 20
Tgal
Water Disposal $888 20
Tgal
Other Liquid (non-haz) $531 1
gal
TOTAL YEARLY COSTS $132,247
RECOMMENDED SAVINGS* $21,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7233: Use properly designed and sized hvac equipment $7,271 - $6,469
59,849
kWh
$802
-
kW-mo/yr
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,778 - - $5,778
-
kW-mo/yr
03 2.7135: Install occupancy sensors $757 $247 $429
3,971
kWh
$328
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,634 $6,580 $6,265
57,957
kWh
$1,369
-
kW-mo/yr
TOTAL RECOMMENDED $21,440 $6,827 $13,163
121,777
kWh
$8,277
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs