ITAC Assessment: SD0330
ITAC logo
ITAC Assessment: SD0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aerospace fasteners
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 77,000
ft2
Annual Production 200,000
lb
Production Hrs. Annual 5,087
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,649 2,119,924
kWh
Electricity Demand $88,106 6,508
kW-mo/yr
Electricity Fees $9,029 -
Natural Gas $12,086 1,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $887

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,782 $1,425 $17,182
146,231
kWh
$3,600
-
kW-mo/yr
- - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,189 $6,000 $1,309
11,138
kWh
$2,194
-
kW-mo/yr
$(-314.0)
-
MMBtu
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,836 $4,000 $1,454
12,375
kWh
$731
-
kW-mo/yr
$(-349.0)
-
MMBtu
- -
04 2.7111: Reduce illumination to minimum necessary levels $887 $80 $724
6,159
kWh
$163
-
kW-mo/yr
- - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,500 $10,000 - - - $3,500
-
lb
-
06 4.446: Automate finishing process $96,800 $200,000 - - - - $96,800
TOTAL RECOMMENDED $126,994 $221,505 $20,669
175,903
kWh
$6,688
-
kW-mo/yr
$(-663.0)
-
MMBtu
$3,500
-
lb
$96,800
TOTAL IMPLEMENTED $887 $80 $724
6,159
kWh
$163
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs