Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,698

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0813 #01 Y:2025 Lower temperature during the winter season and vice-versa $975 -
UU0286 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,200 $15,740
UU0286 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,270 $1,800
UU0286 #03 Y:2025 Replace fossil fuel equipment with electrical equipment $18,569 $141,050
UU0286 #02 Y:2025 Utilize controls to operate equipment only when needed $59,940 $100,340
UU0286 #01 Y:2025 Increase efficiency of trucks $126,055 $584,355
OK1160 #08 Y:2025 Conserve energy by efficient use of vending machines $474 $555
OK1160 #07 Y:2025 Optimize plant power factor $6,814 $11,190
OK1160 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $959 $2,390
OK1160 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,352 $1,780
OK1160 #04 Y:2025 Clean and maintain refrigerant condensers and towers $1,937 $910
OK1160 #03 Y:2025 Replace existing hvac unit with high efficiency model $1,130 $8,800
OK1160 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,095 $2,415
OK1160 #01 Y:2025 Use solar heat to make electricty $17,376 $187,200
NL0122 #07 Y:2025 Reschedule plant operations or reduce load to avoid peaks $931 $90
NL0122 #06 Y:2025 Change rate schedules or other changes in utility service $1,242 $120
NL0122 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,650 $12,200
NL0122 #04 Y:2025 Turn off equipment when not in use $5,864 $120
NL0122 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,944 $13,202
NL0122 #02 Y:2025 Optimize plant power factor $10,000 $15,600