ITAC Assessment: UU0286
ITAC logo
ITAC Assessment: UU0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Ready-Mix Concrete
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $50
M
to 100
M
# of Employees 87
Plant Area 19,796
ft2
Annual Production 330,000
ton
Production Hrs. Annual 2,500
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,485 711,480
kWh
Electricity Demand $25,833 3,458
kW-mo/yr
Electricity Fees $1,633 -
Natural Gas $149,839 12,383
MMBtu
Other Energy $734,219 27,265
MMBtu
TOTAL YEARLY COSTS $939,009
RECOMMENDED SAVINGS* $208,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings One-time Revenue or Avoided Cost Savings
01 2.8226: Increase efficiency of trucks $126,055 $584,355 - - $126,055
-
MMBtu
-
02 2.6231: Utilize controls to operate equipment only when needed $59,940 $100,340 - - $11,310
-
MMBtu
$48,630
03 2.1321: Replace fossil fuel equipment with electrical equipment $18,569 $141,050 $(-43,971.0)
(-1,138,250)
kWh
$(-42,070.0)
-
kW-mo/yr
$104,610
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,270 $1,800 $1,270
32,550
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,200 $15,740 $1,877
48,590
kWh
$323
-
kW-mo/yr
- -
TOTAL RECOMMENDED $208,034 $843,285 $(-40,824.0)
(-1,057,110)
kWh
$(-41,746.6)
-
kW-mo/yr
$241,975
-
MMBtu
$48,630
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs