ITAC Assessment: SU0322
ITAC logo
ITAC Assessment: SU0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Video Borescopes
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 180
Plant Area 73,900
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,047 1,084,500
kWh
Electricity Demand $9,262 3,497
kW-mo/yr
Electricity Fees $8,178 -
Natural Gas $16,673 1,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $6,386 - $6,386
106,438
kWh
- - - -
02 2.7314: Reduce ventilation air $12,242 $7,179 $623
10,387
kWh
$148
-
kW-mo/yr
$11,471
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $876 $528 $436
7,271
kWh
$26
-
kW-mo/yr
- $150 $264
04 2.6211: Conserve energy by efficient use of vending machines $109 $298 $109
1,809
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $229 $639 $229
3,805
kWh
- - - -
06 2.7122: Disconnect ballasts $2,772 $9,240 $1,656
27,605
kWh
$276
-
kW-mo/yr
- $480 $360
07 2.4321: Upgrade obsolete equipment $1,164 $5,472 $1,098
18,308
kWh
$66
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $23,778 $23,356 $10,537
175,623
kWh
$516
-
kW-mo/yr
$11,471
-
MMBtu
$630 $624
TOTAL IMPLEMENTED $11,198 $15,240 $9,576
159,622
kWh
$368
-
kW-mo/yr
- $630 $624
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs