Assessment Year | 2012 |
---|---|
Principal Product | Video Borescopes |
NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 180 |
Plant Area |
73,900
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,047 | 1,084,500 |
kWh
|
$0.055 |
Electricity Demand | $9,262 | 3,497 |
kW-mo/yr
|
$2.65 |
Electricity Fees | $8,178 | - |
|
- |
Natural Gas | $16,673 | 1,951 |
MMBtu
|
$8.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $23,778 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,198 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $6,386 | - |
$6,386
106,438
kWh
|
- | - | - | - | |
02 | 2.7314: Reduce ventilation air | $12,242 | $7,179 |
$623
10,387
kWh
|
$148
-
kW-mo/yr
|
$11,471
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $876 | $528 |
$436
7,271
kWh
|
$26
-
kW-mo/yr
|
- | $150 | $264 | |
04 | 2.6211: Conserve energy by efficient use of vending machines | $109 | $298 |
$109
1,809
kWh
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $229 | $639 |
$229
3,805
kWh
|
- | - | - | - | |
06 | 2.7122: Disconnect ballasts | $2,772 | $9,240 |
$1,656
27,605
kWh
|
$276
-
kW-mo/yr
|
- | $480 | $360 | |
07 | 2.4321: Upgrade obsolete equipment | $1,164 | $5,472 |
$1,098
18,308
kWh
|
$66
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $23,778 | $23,356 |
$10,537
175,623
kWh
|
$516
-
kW-mo/yr
|
$11,471
-
MMBtu
|
$630 | $624 | ||
TOTAL IMPLEMENTED | $11,198 | $15,240 |
$9,576
159,622
kWh
|
$368
-
kW-mo/yr
|
- | $630 | $624 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs