170,687
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0345 #07 Y:2025 | 07 | 2025 | Recover waste heat from equipment | $9,214 | $15,000 |
n/a
|
| TT0345 #06 Y:2025 | 06 | 2025 | Change rate schedules or other changes in utility service | $35,814 | - |
n/a
|
| TT0345 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $8,421 | $2,000 |
n/a
|
| TT0345 #04 Y:2025 | 04 | 2025 | Install occupancy sensors | $1,024 | $690 |
n/a
|
| TT0345 #03 Y:2025 | 03 | 2025 | Analyze flue gas for proper air/fuel ratio | $6,868 | $1,400 |
n/a
|
| TT0345 #02 Y:2025 | 02 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,717 | $60 |
n/a
|
| TT0345 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,654 | $8,950 |
n/a
|
| ORC018 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,990 | $500 | |
| ORC018 #03 Y:2025 | 03 | 2025 | Install outside air damper / economizer on hvac unit | $2,492 | $1,000 | |
| ORC018 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $851 | $3,506 | |
| ORC018 #01 Y:2025 | 01 | 2025 | Utilize higher efficiency lamps and/or ballasts | $5,458 | $65,607 | |
| OR0815 #05 Y:2025 | 05 | 2025 | Use solar heat to make electricty | $46,573 | $585,200 | |
| OR0815 #04 Y:2025 | 04 | 2025 | Replace fossil fuel equipment with electrical equipment | $25,957 | $207,548 | |
| OR0815 #03 Y:2025 | 03 | 2025 | Optimize plant power factor | $1,730 | $11,865 | |
| OR0815 #02 Y:2025 | 02 | 2025 | Insulate glazing, walls, ceilings, and roofs | $2,073 | $10,282 | |
| OR0815 #01 Y:2025 | 01 | 2025 | Replace hydraulic / pneumatic equipment with electric equipment | $6,592 | $1,551 | |
| NL0123 #06 Y:2025 | 06 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $697 | $443 | |
| NL0123 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,523 | $9,000 | |
| NL0123 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $23,122 | $24,804 | |
| NL0123 #03 Y:2025 | 03 | 2025 | Optimize plant power factor | $206,052 | $550,650 |