ITAC Assessment: ORC018
ITAC logo
ITAC Assessment: ORC018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product printing and mailing, electronics recycling, janitorial services
NAICS 624310: Vocational Rehabilitation Services
SIC 8331: Job Training and Vocational Rehabilitation Services
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 53,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,664 342,500
kWh
Electricity Demand $16,240 828
kW-mo/yr
Electricity Fees $1,974 -
Natural Gas $4,865 440
MMBtu
TOTAL YEARLY COSTS $48,743
RECOMMENDED SAVINGS* $11,791 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,458 $65,607 $1,295
17,275
kWh
$1,303
-
kW-mo/yr
$2,860
02 2.7135: Install occupancy sensors $851 $3,506 $851
11,359
kWh
- -
03 2.7241: Install outside air damper / economizer on hvac unit $2,492 $1,000 $2,492
33,260
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,990 $500 $566
7,556
kWh
$2,424
-
kW-mo/yr
-
TOTAL RECOMMENDED $11,791 $70,613 $5,204
69,450
kWh
$3,727
-
kW-mo/yr
$2,860
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs