ITAC Assessment: TT0345
ITAC logo
ITAC Assessment: TT0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Bread/Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 254
Plant Area 130,000
ft2
Annual Production 110,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $599,530 7,857,000
kWh
Electricity Demand $199,718 14,894
kW-mo/yr
Electricity Fees $14,650 -
Natural Gas $362,208 54,400
MMBtu
Waste Disposal Costs
Water Usage $29,679 6,908
Tgal
Water Disposal $86,868 6,908
Tgal
TOTAL YEARLY COSTS $1,292,653
RECOMMENDED SAVINGS* $106,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,654 $8,950 $12,654
166,503
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,717 $60 $4,717
62,075
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $6,868 $1,400 - $6,868
-
MMBtu
-
04 2.7135: Install occupancy sensors $1,024 $690 $1,024
13,473
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,421 $2,000 $8,421
110,810
kWh
- -
06 2.8114: Change rate schedules or other changes in utility service $35,814 - - - $35,814
07 2.2437: Recover waste heat from equipment $9,214 $15,000 - $9,214
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,442 $3,250 $14,442
190,028
kWh
- -
09 2.4224: Upgrade controls on compressors $13,516 $10,000 $13,516
177,847
kWh
- -
TOTAL RECOMMENDED $106,670 $41,350 $54,774
720,736
kWh
$16,082
-
MMBtu
$35,814
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs