ITAC Assessment: OR0815
ITAC logo
ITAC Assessment: OR0815
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Steel Drums
NAICS 332439: Other Metal Container Manufacturing
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 39,600
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,431 1,128,510
kWh
Electricity Demand $49,582 3,706
kW-mo/yr
Electricity Fees $11,152 -
Natural Gas $65,186 7,539
MMBtu
TOTAL YEARLY COSTS $211,351
RECOMMENDED SAVINGS* $82,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $6,592 - $3,264
43,115
kWh
$3,328
-
kW-mo/yr
- - -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $1,927 - - - $1,927
-
MMBtu
- -
03 2.3212: Optimize plant power factor $1,730 - - - - - $1,730
04 2.1321: Replace fossil fuel equipment with electrical equipment $25,957 $100,474 $(-5,905.0)
(-78,000)
kWh
- - $15,737
-
gal
$16,125
05 2.9114: Use solar heat to make electricty $46,573 $285,200 $31,625
119,681
kWh
$14,948
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $82,779 $385,674 $28,984
84,796
kWh
$18,276
-
kW-mo/yr
$1,927
-
MMBtu
$15,737
-
gal
$17,855
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs