ITAC Assessment: TR0045
ITAC logo
ITAC Assessment: TR0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Precision machined parts
NAICS 332721: Precision Turned Product Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 195
Plant Area 56,000
ft2
Annual Production 84,000,000
units
Production Hrs. Annual 3,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $451,134 5,035,524
kWh
TOTAL YEARLY COSTS $451,134
RECOMMENDED SAVINGS* $19,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $454 $640 $454
5,040
kWh
02 2.9114: Use solar heat to make electricty $11,383 $217,770 $11,383
126,480
kWh
03 2.2511: Insulate bare equipment $7,255 $126 $7,255
80,607
kWh
TOTAL RECOMMENDED $19,091 $218,536 $19,091
212,127
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs