Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,938

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2604 #05 Y:2026 Preheat boiler makeup water with waste process heat $142,638 $20,879
UW2604 #04 Y:2026 Increase efficiency of trucks $13,220 $159,000
UW2604 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $20,196 $20,581
UW2604 #02 Y:2026 Use most efficient type of electric motors $1,937 $19,404
UW2604 #01 Y:2026 Burn wood by-products for heat $2,032,454 $1,536,600
SJ0047 #04 Y:2026 Use optimum temperature $2,016 -
SJ0047 #03 Y:2026 Preheat boiler makeup water with waste process heat $2,804 $626
SJ0047 #02 Y:2026 Reschedule and rearrange multiple-source heating systems $12,716 -
SJ0047 #01 Y:2026 Use battery storage for demand control $32,563 $178,188
NT0059 #08 Y:2026 Lower temperature during the winter season and vice-versa $4,998 -
NT0059 #07 Y:2026 Optimize plant power factor $10,008 $29,441
NT0059 #06 Y:2026 Prevent excessive solvent usage (operator training) $15,300 $900
NT0059 #05 Y:2026 Replace existing hvac unit with high efficiency model $217,371 $827,008
NT0059 #04 Y:2026 Install equipment (eg compactor) to reduce disposal costs $36,000 $66,400
NT0059 #03 Y:2026 Apply for tax-free status for energy purchases $43,726 $5,000
NT0059 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $48,097 $5,753
NT0059 #01 Y:2026 Change procedures / equipment / operating conditions $151,111 $279,044
MZ0395 #06 Y:2026 Use solar heat to make electricty $209,252 $1,881,750
MZ0395 #05 Y:2026 Use waste heat from hot flue gases to preheat $11,132 $80,000
MZ0395 #04 Y:2026 Install occupancy sensors $798 $1,700