| Assessment Year | 2026 |
|---|---|
| Principal Product | Packaged Peanuts |
| NAICS | 311911: Roasted Nuts and Peanut Butter Manufacturing |
| SIC | 2068: Salted and Roasted Nuts and Seeds |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
65,000
ft2
|
| Annual Production | 108,210,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $388,735 | 3,780,400 |
kWh
|
$0.10 |
| Electricity Demand | $87,373 | 17,633 |
kW-mo/yr
|
$4.96 |
| Electricity Fees | $79,508 | - |
|
- |
| Natural Gas | $92,069 | 10,190 |
MMBtu
|
$9.04 |
| TOTAL YEARLY COSTS | $647,685 | |||
| RECOMMENDED SAVINGS* | $250,818 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $187,521 | $772,200 |
$157,791
1,531,954
kWh
|
$29,730
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.1213: Direct warmest air to combustion intake | $28,912 | $11,000 | - | - |
$28,912
-
MMBtu
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,881 | $43,740 |
$18,881
183,313
kWh
|
- | - | - | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,330 | $4,330 |
$3,590
26,041
kWh
|
- | - | $311 | $429 | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,903 | - |
$2,903
19,749
kWh
|
- | - | - | - | |
| 06 | 2.2623: Minimize condenser cooling water temperature | $2,060 | $1,508 |
$2,060
20,000
kWh
|
- | - | - | - | |
| 07 | 2.4112: Install soft-start to eliminate nuisance trips | $2,089 | $1,924 |
$2,089
20,981
kWh
|
- | - | - | - | |
| 08 | 2.6213: Turn off steam / hot water lines leading to space heating units | $1,026 | $3,500 |
$1,026
9,960
kWh
|
- | - | - | - | |
| 09 | 4.513: Re-arrange equipment layout to reduce labor costs | $3,096 | $3,360 | - | - | - | - | $3,096 | |
| TOTAL RECOMMENDED | $250,818 | $841,562 |
$188,340
1,811,998
kWh
|
$29,730
-
kW-mo/yr
|
$28,912
-
MMBtu
|
$311 | $3,525 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs