ITAC Assessment: UF0649
ITAC logo
ITAC Assessment: UF0649
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Packaged Peanuts
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 65,000
ft2
Annual Production 108,210,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,735 3,780,400
kWh
Electricity Demand $87,373 17,633
kW-mo/yr
Electricity Fees $79,508 -
Natural Gas $92,069 10,190
MMBtu
TOTAL YEARLY COSTS $647,685
RECOMMENDED SAVINGS* $250,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $187,521 $772,200 $157,791
1,531,954
kWh
$29,730
-
kW-mo/yr
- - -
02 2.1213: Direct warmest air to combustion intake $28,912 $11,000 - - $28,912
-
MMBtu
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,881 $43,740 $18,881
183,313
kWh
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,330 $4,330 $3,590
26,041
kWh
- - $311 $429
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,903 - $2,903
19,749
kWh
- - - -
06 2.2623: Minimize condenser cooling water temperature $2,060 $1,508 $2,060
20,000
kWh
- - - -
07 2.4112: Install soft-start to eliminate nuisance trips $2,089 $1,924 $2,089
20,981
kWh
- - - -
08 2.6213: Turn off steam / hot water lines leading to space heating units $1,026 $3,500 $1,026
9,960
kWh
- - - -
09 4.513: Re-arrange equipment layout to reduce labor costs $3,096 $3,360 - - - - $3,096
TOTAL RECOMMENDED $250,818 $841,562 $188,340
1,811,998
kWh
$29,730
-
kW-mo/yr
$28,912
-
MMBtu
$311 $3,525
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs