ITAC Assessment: CO0381
ITAC logo
ITAC Assessment: CO0381
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product ice cream and yogurt
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 27
Plant Area 25,700
ft2
Annual Production 4,000,000
Tgal
Production Hrs. Annual 3,510
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,261 3,155,920
kWh
Electricity Demand $116,780 9,712
kW-mo/yr
Electricity Fees $(-3.0) -
Natural Gas $21,759 5,978
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,458 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,688

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $689 $1,914 $267
9,672
kWh
$422
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $179 $602 $99
3,517
kWh
$80
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,020 $190 $410
14,947
kWh
$610
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $770 $510 $310
11,137
kWh
$460
-
kW-mo/yr
- - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $12,550 $12,500 - - $11,960
-
lb
- - $590
06 4.112: Replace old machine with new automatic multi-station tool $75,250 $320,000 - - - $67,420 $7,830 -
TOTAL RECOMMENDED $90,458 $335,716 $1,086
39,273
kWh
$1,572
-
kW-mo/yr
$11,960
-
lb
$67,420 $7,830 $590
TOTAL IMPLEMENTED $89,688 $335,206 $776
28,136
kWh
$1,112
-
kW-mo/yr
$11,960
-
lb
$67,420 $7,830 $590
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs