| Assessment Year | 1997 |
|---|---|
| Principal Product | ice cream and yogurt |
| NAICS |
n/a
|
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $10 M to 50M |
| # of Employees | 27 |
| Plant Area |
25,700
ft2
|
| Annual Production | 4,000,000
Tgal
|
| Production Hrs. Annual | 3,510
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $87,261 | 3,155,920 |
kWh
|
$0.028 |
| Electricity Demand | $116,780 | 9,712 |
kW-mo/yr
|
$12.02 |
| Electricity Fees | $(-3.0) | - |
|
- |
| Natural Gas | $21,759 | 5,978 |
MMBtu
|
$3.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $90,458 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $89,688 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $689 | $1,914 |
$267
9,672
kWh
|
$422
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $179 | $602 |
$99
3,517
kWh
|
$80
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,020 | $190 |
$410
14,947
kWh
|
$610
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $770 | $510 |
$310
11,137
kWh
|
$460
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $12,550 | $12,500 | - | - |
$11,960
-
lb
|
- | - | $590 | |
| 06 | 4.112: Replace old machine with new automatic multi-station tool | $75,250 | $320,000 | - | - | - | $67,420 | $7,830 | - | |
| TOTAL RECOMMENDED | $90,458 | $335,716 |
$1,086
39,273
kWh
|
$1,572
-
kW-mo/yr
|
$11,960
-
lb
|
$67,420 | $7,830 | $590 | ||
| TOTAL IMPLEMENTED | $89,688 | $335,206 |
$776
28,136
kWh
|
$1,112
-
kW-mo/yr
|
$11,960
-
lb
|
$67,420 | $7,830 | $590 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs