ITAC Assessment: WI0086
ITAC logo
ITAC Assessment: WI0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CORRUGATED BOARDS
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,563 2,982,708
kWh
Natural Gas $276,456 76,838
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $39,882 - $44,682
-
kWh
- $(-4,800.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,034 $2,719 $7,034
84,701
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $2,311 - $2,311
27,843
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,293 $7,000 - $2,293
-
MMBtu
-
05 2.7494: Install storm windows and doors $1,028 $2,448 - $1,028
-
MMBtu
-
06 2.7261: Install timers and/or thermostats $799 $250 - $799
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $679 $500 - $729
-
MMBtu
$(-50.0)
08 2.4221: Install compressor air intakes in coolest locations $508 $2,000 $508
6,155
kWh
- -
TOTAL RECOMMENDED $54,534 $14,917 $54,535
118,699
kWh
$4,849
-
MMBtu
$(-4,850.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs