ITAC Assessment: AM0048
ITAC logo
ITAC Assessment: AM0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product OIL FIELD RELATED PRODS.
NAICS
n/a
SIC 3624: Carbon and Graphite Products
Sales Range $10
M
to 50
M
# of Employees 119
Plant Area
n/a
Annual Production 17,400
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,506 3,805,100
kWh
Natural Gas $330,260 104,091
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,158

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $21,794 $19,916 $(-4,771.0)
(-88,218)
kWh
$26,565
-
MMBtu
02 2.8112: Combine utility meters $4,400 - - $4,400
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,025 $700 $2,025
46,600
kWh
-
04 2.4312: Improve lubrication practices $2,517 - $2,517
58,030
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,274 - $2,274
52,462
kWh
-
06 2.1135: Repair furnaces and oven doors so that they seal efficiently $1,275 $1,600 - $1,275
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $65 $57 $65
879
kWh
-
TOTAL RECOMMENDED $34,350 $22,273 $2,110
69,753
kWh
$32,240
-
MMBtu
TOTAL IMPLEMENTED $26,158 $20,673 $(-407.0)
11,723
kWh
$26,565
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs