ITAC Assessment: NV0142
ITAC logo
ITAC Assessment: NV0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product MDF Mouldings
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 102,500
ft2
Annual Production 22,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,045 2,287,222
kWh
Electricity Demand $71,068 5,672
kW-mo/yr
Electricity Fees $2,384 -
Natural Gas $65,049 13,878
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,211 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,797

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4133: Use most efficient type of electric motors $6,150 $12,127 $3,515
58,910
kWh
$2,624
-
kW-mo/yr
$11
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $414 $270 $224
3,810
kWh
$190
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $525 - $368
6,155
kWh
$156
-
kW-mo/yr
$1
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,122 $30,600 $8,650
136,577
kWh
$2,443
-
kW-mo/yr
$29
TOTAL RECOMMENDED $18,211 $42,997 $12,757
205,452
kWh
$5,413
-
kW-mo/yr
$41
TOTAL IMPLEMENTED $17,797 $42,727 $12,533
201,642
kWh
$5,223
-
kW-mo/yr
$41
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs