| Assessment Year | 2026 |
|---|---|
| Principal Product | plastic bottles |
| NAICS | 326160: Plastics Bottle Manufacturing |
| SIC | 3085: Plastics Bottles |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
146,000
ft2
|
| Annual Production | 120,000,000
units
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $438,828 | 9,629,200 |
kWh
|
$0.046 | |
| Electricity Demand | $297,064 | 41,323 |
kW-mo/yr
|
$7.19 | |
| Natural Gas | $6,222 | 803 |
MMBtu
|
$7.75 | |
| Waste Disposal Costs | |||||
| Water Usage | $26,810 | 3,423 |
Tgal
|
$7.83 | |
| Water Disposal | $17,038 | 2,401 |
Tgal
|
$7.10 | |
| TOTAL YEARLY COSTS | $785,962 | ||||
| RECOMMENDED SAVINGS* | $144,634 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $51,051 | $772,200 |
$51,051
1,109,809
kWh
|
- | - | |
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $3,425 | $7,920 |
$3,425
74,456
kWh
|
- | - | |
| 03 | 2.7226: Use computer programs to optimize hvac performance | $17,696 | $126,000 |
$17,696
384,685
kWh
|
- | - | |
| 04 | 2.7211: Clean and maintain refrigerant condensers and towers | $20,345 | $2,465 |
$20,345
442,276
kWh
|
- | - | |
| 05 | 2.3212: Optimize plant power factor | $10,143 | $29,160 | - | - | $10,143 | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $26,153 | $68,845 |
$26,153
568,545
kWh
|
- | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $4,808 | $2,460 |
$3,958
86,050
kWh
|
$850
-
kW-mo/yr
|
- | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,745 | - |
$6,745
146,634
kWh
|
- | - | |
| 09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,268 | - | - |
$4,268
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $144,634 | $1,009,050 |
$129,373
2,812,455
kWh
|
$5,118
-
kW-mo/yr
|
$10,143 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs