Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,614

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0700 #04 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $2,072 $2,000
SD0700 #03 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $922 $1,000
SD0700 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $1,294 -
SD0700 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $187 $762
UD1151 #05 Y:2026 Use solar heat to make electricty $129,213 $1,350,000
UD1151 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $15,023 $27,000
UD1151 #03 Y:2026 Minimize use of outside make-up air for ventilation except when used for economizer cycle $6,394 $17,000
UD1151 #02 Y:2026 Reduce ventilation air $12,198 $22,000
UD1151 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,394 $12,000
MI0478 #04 Y:2026 Use demand controller or load shedder $4,519 $18,392
MI0478 #03 Y:2026 Turn off equipment when not in use $14,074 $2,600
MI0478 #02 Y:2026 Lower temperature during the winter season and vice-versa $27,548 $480
MI0478 #01 Y:2026 Reschedule plant operations or reduce load to avoid peaks $4,889 -
LS0726 #03 Y:2026 Replace existing chiller with high efficiency model $20,418 $305,250
LS0726 #02 Y:2026 Install occupancy sensors $2,920 $22,000
LS0726 #01 Y:2026 Reduce heat gain by window tinting $21,059 $68,250
MI0477 #06 Y:2026 Optimize plant power factor $4,509 $19,466
MI0477 #05 Y:2026 Change rate schedules or other changes in utility service $96 $104
MI0477 #04 Y:2026 Close holes and openings in building such as broken windows $657 $396
MI0477 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $23,136 $1,886