ITAC Assessment: UD1151
ITAC logo
ITAC Assessment: UD1151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product community center, exercise facilities
NAICS 713940: Fitness and Recreational Sports Centers
SIC 7991: Physical Fitness Facilities
Sales Range less than $500
k
# of Employees 100
Plant Area 63,000
ft2
Annual Production 1
units
Production Hrs. Annual 5,150
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,815 1,628,207
kWh
Natural Gas $82,312 9,929
MMBtu
Waste Disposal Costs
Water Usage $36,000 3,000
Tgal
TOTAL YEARLY COSTS $302,127
RECOMMENDED SAVINGS* $166,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,394 $12,000 $3,394
30,067
kWh
-
02 2.7314: Reduce ventilation air $12,198 $22,000 $6,604
58,494
kWh
$5,594
-
MMBtu
03 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $6,394 $17,000 $3,783
33,508
kWh
$2,611
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,023 $27,000 $15,023
133,075
kWh
-
05 2.9114: Use solar heat to make electricty $129,213 $1,350,000 $129,213
1,144,549
kWh
-
TOTAL RECOMMENDED $166,222 $1,428,000 $158,017
1,399,693
kWh
$8,205
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs